NOTE: This is a discussion list reponse. Click to see the entire topic page.

CPUSA

10/27/2012
7:17:51 AM
"The construction costs of the second section of the walk will be funded by a federal grant of $1.6 million, Bissonnette explained. No taxpayer dollars have been used in developing the river walk, he added."

Really?! Does the Mayor think federal grants are funded by aliens from Mars? Iron Horse removed well over $100,000 worth of iron rail the city owned along that rail bed.

"The mayor added that there would be access points for fishing." One had better be a damned accurate angler to cast through tree limbs and 20 feet away to the river.
 
 
Reminder Publications, Inc. 280 North Main St., East Longmeadow, MA 01028 • Tel: 413.525.6661 • Fax 413.525.5882

Web Design by
Home